news center
Production News Express
2022-05-15 views 467
On May15, the third 700FEU LNG Container Deck Carrier "TIGER LIANYUNGANG",which is jointly developed by our group and Tiger Gas, started its maidenvoyage after delivery.
The shipwas ignited and steel-cut on May 12, 2021. Despite the severe period of epidemicprevention and control during the trial voyage and delivery of inspection, YZJstaff consciously and conscientiously implemented the normal epidemicprevention and control and safe production, and maintained orderly productionunder the closed management mode.
Althoughthe trial voyage, delivery and inspection are in a critical period of epidemicprevention and control, the Shiplifters conscientiously and strictly implementthe standardized epidemic prevention and control and safe production, and stillmaintain orderly production under the closed management mode, and strive to protectthe nodes. The ship has started operation on May 12,2021. Although the trialvoyage and inspection stage meet the severe period of epidemic prevention andcontrol, yangchuan people consciously and conscientiously implement the normalepidemic prevention and control and safe production, and under the closedmanagement mode, they still maintain orderly production to ensure the node. Theship started operation on May 12, 2021. Despite the severe period of epidemicprevention and control during the trial voyage and delivery of inspection, thecrew of the ship consciously implemented the normal epidemic prevention andcontrol and safe production, and maintained orderly production under the closedmanagement mode.
On May13, Mr. Xue Chaochun, chairman of TIGER GAS, Mr. Xu Junfeng, President of TIGERGAS, Mr. Yang Jiansong, Deputy General Manager of Greathorse International Ship Management Co., Ltd. inShanghai, Mr. DuChengzhong, Deputy General Manager of our Group, and Mr. Zhang Tao, Deputy GeneralManager of our Group, completed the cloud delivery of "TIGER LIANYUNGANG "through multi-party video conference.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…