news center
Production News Express
2022-12-13 views 201
At 8: 58 a.m. on December 13th, the newbuilding ship “SITCXIANDE”, built by Yangzi Changbo Shipyard for Haifeng International, untied itsmooring ropes and set sail from the shipyard wharf. This ship is the 10th of the 12 sister ships of 1800TEU series. On December 12th, our company and the shipowner Haifeng International successfully held the video online delivery ceremony for the newbuilding ship “SITC XIANDE”.
The ship was steel-cut on February 14th, 2022. On the basis of previous experience in building a series of ships, by further strengthening quality control and production planning, Yangzi Changbo Shipyard can becompleted and delivered with good quality in only 10 months. Sincerely wish"SITC XIANDE" a smooth sailing and a full load of classes in heroperation.
The delivery and departure of "SITC XIANDE" indicatesthat Yangzi Changbo Shipyard has fully completed the operation and production target task of steel-cut 6 ships, launching 6 ships and delivering 6 ships in2022.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…